A Remodeling Update: The Mess Continues & Ms. Bean Is Almost Beyond Caring

The mess continues, but there is progress.  

√  The bathroom is close to being finished.  We’re waiting on the rest of the decorative tile that the tile guy, when he’s available, will use to make a backsplash behind the sinks.

The tile, shipped from California, is apparently coming via pony express, whose riders like to spend a few nights vacation in Las Vegas before heading east with it.

Or maybe it arrives via passenger pigeon.  At this point I’ve lost track of how it gets here, and only know that I want it here because until that decorative tile makes me happy this project won’t be over.  So I wait.

√  The family room is in process.  We had a small set-back when the painters fessed up to painting it the wrong color.  They had used the bathroom wall color in the family room.  While the colors are similar, they aren’t interchangeable… so the painters graciously made things right and re-painted the family room.   

I’ll show you a pic of the finished room, with proper color on its walls when I do my final post about this remodeling wild ride.  Sometime this month? This year? During my lifetime? Who knows?

  The laundry room is in good shape.  The washer and dryer are here, the counter and tile have been installed, and the walls have been painted the proper color. 🙄

The only difficulty with the laundry room now is that it’s on the way to the garage– that’s still a warehouse for things to come.  I look forward to parking my car where the bathtub is now, and walking from the garage into the laundry room unimpeded.  I dream big, don’t I? 

  The kitchen remains in a holding pattern.  There’s no sign of the microwave.  It’s MIA.  And conversations about replacing the old caulk that’s between the granite countertop and the tile backsplash have taken a turn for the absurd.

Seems that our grout and our caulk don’t match– and they’re [were] supposed to.  While I’m the first to say the combo looked good to me [for the last 9 years], these particular colors, that I’ve dubbed Dragon Snot and Cat Barf, are no longer available.  Hence, there’s been much discussion about what currently available caulk color to use now;  Antique Dog Tooth seems to be in the lead.  Because, why not?    

• • •

August is a slow month in the blogosphere, and I don’t feel like writing & posting my usual 2 or 3 times per week.
So for this month I’ll be here once a week sharing my flapdoodle and twaddle with those who are around to read it.  See you next week, kids. 

• • •

A Remodeling Update: My Kingdom For Some Tile

Decorative tile, laying on the floor, that’ll be the accent in the shower and by the sinks.

Well, kids, not everything runs smoothly during a remodel.  You see, there’s been a kerfuffle here about the wall tile that goes in the shower stall.  Not the little decorative stuff*, but the large tiles that cover the walls.

The problem, quite simply, has been that the tile company sent the correct decorative and floor tiles over to the house– but filled our wall tile order incorrectly.  They sent packages of tile with the same name + code number, but these packages of tile weren’t from the same “dye lots” so they weren’t the exact same color.

Which they are supposed to be.

Example of the tile in question.

Thus began what turned out to be 3 weeks of discussions among unhappy me, lawyerly Zen-Den, our patient project manager, the perturbed remodeling company design staff, the conscientious tile installer– and the confused [sneaky?] tile company.

Much was said, politely— but with a great deal of emphasis on MAKE THIS RIGHT.

No pithy conclusion to this post.  I’m just happy to report that the correct wall tile finally arrived on Tuesday and that each package has the same batch number.

Even more exciting than getting the tile is knowing that the tile guy is now in the process of installing the tile on the walls in the shower– and that the walls coordinate beautifully with the shower floor.

As planned.

Tile on the floor of the shower stall, installed and looking lovely.

* I wrote this post yesterday mid-afternoon. As the tile guy left late yesterday afternoon he told me that the tile company had shorted us on the decorative tile that is to go on the wall behind the sinks.  This is not as big of a problem as the wall tile kerfuffle, but it’s a problem that will have to be solved nonetheless.  *le sigh*

A Remodeling Update: 7 Holes In The Ceiling + A Few Details About Each Room

We’re in the middle of the remodel now.  It has been four weeks since we began.  

In that time 7 holes have been cut in ceilings to either accommodate new lights and fans that will be placed overhead– or to double-check second floor water pipes from below in the kitchen.  

What I’ve learned about myself during these past weeks is that I find holes in the ceiling a bit unnerving.  Walls torn out don’t concern me so much, but those… holes… up… there… bother… me.

Go figure.

~ ~ ~ ~

 The LAUNDRY ROOM has new cabinets in it and the water pipes + dryer duct have been re-routed to accommodate the new washer and dryer– which are to be delivered here later this week.

Last Friday I picked the tile for the backsplash and the wall color with the interior designer, so all that’s left for me to do is to go to the granite store on the day that they cut the counter to decide what part of the slab will be our counter.

 The MASTER BATHROOM wiring and plumbing have been reconfigured, the dry wall crew has been here and gone– meaning that we’re all about tile now.  We decided on the tile weeks ago and are currently sitting back, watching some of the tile come together, while the rest of it seems to be lost somewhere. Somehow.

 The FAMILY ROOM is changing from tile around the fireplace to granite– and there’s to be a new mantle.  None of this is anywhere to be seen yet, but the crew has prepped the wall and floor for what is to come. Hence, we wait.

I have no idea what color the walls will be in there, other than to say “good-bye purple.”  The granite, once installed, will show us how it looks with our furniture so that we’ll have a better idea about wall color, but ultimately I’m leaving that decision up to the interior designer.

 The KITCHEN tweaks are seemingly a forgotten part of this remodel.  I have delegated the whole microwave kerfuffle to Zen-Den because I don’t care what the solution to the problem is… as long as I get a microwave.

As for the other little details in the kitchen they are: 1) a new door and handle on the trash bin cabinet;  and 2) re-doing the juncture where the counter meets the tile.  I’m on top of these details because I want them done before all of this remodeling is over.  Which is to say sometime this month, “God willing and the creek don’t rise.” 

~ ~ ~ ~

A Remodeling Update: In Which Ms. Bean “Helps” & Other Important Things

It will come as no surprise to you, but it’s a mess around here.

Dining room with stuff from other rooms in it.

 Nothing is where it’s supposed to be.  Rooms that aren’t being remodeled have been turned into storage spaces for the stuff from rooms that are being remodeled.

Then with no clothes dryer, we’re using portable wooden racks, wedged into bedroom corners, to dry our clothes and towels and unmentionables… that are getting covered in a layer of dust before they dry, courtesy of the construction all over the house.

 Because the family room and the master suite are under construction, Zen-Den and I are living on the other side of the upstairs, each having taken up camp in a different guest bedroom.  At night we shout “good night” to each other like we’re the fricking Waltons: “Good night, Sue Mary Ellen… Good night, John-Boy.” 

Old microwave sitting on counter underneath spot where it fit, but new ones won’t.

 I officially hate microwaves.  Did you know that the manufacturers change the sizes of microwaves fairly often?  This means that the one we had built into the kitchen cabinets 9 years ago is now a size that is no longer available.

So we have to redesign the cabinets to accommodate the newer deeper microwaves.  I cannot *mutter* enough about this development.

 When the water is off for a few hours you immediately understand there’s one flush left in the toilet, right?  BUT what you might not remember is that there’ll be no water to wash your hands– and that you’ll need to have some hand wipes around.  IF you don’t have them around, then you’ll end up eating your lunch using a paper towel as you hold your sammie– then perhaps accidentally ingest some paper towel. 😖

Tools and such that are now on the floor hither and yon around the house.

 And finally, how is that I helped?  Well, as if there’s not enough destruction around here, I added to it when I went to close the bathroom door and the handle fell off into my hand.

Just. Like. That. I’m stuck outside the bathroom, holding the formerly useful handle in my hand, looking forlornly at the screws now at my feet.  Screws that happen to be about the same color as the carpeting, allowing them to blend perfectly with the carpet fibers, causing Ms. Bean to become FRAZZLED.

And on that cheery note, I’ll wish y’all a happy weekend.  Catch up with you later, kids.